Gandhi Institute of Technology and Management, popularly known as GITAM, was founded in 1980 by an inspired group of eminent intellectuals and industrialists of Andhra Pradesh led by Dr. M. V. V. S. Murthi, former Member of Parliament and popular philanthropist.
The vision of MAHATMA, the Father of the Nation was to see India as a socially and economically resurgent country and he looked upon education as an important means to achieve this goal. Gandhiji’s view of education was not narrow or sectarian. He envisaged universities as institutions of higher learning that transcend all linguistic, racial and other barriers. GITAM is committed to imbibe his values and abide by his philosophy.
Title | A study analysis and implementation of last planner system in construction industry |
---|---|
Researcher | Hussain, Abdul Mannan S M |
Guide(s) | Dr. Prasad, B S R K |
Keywords | Construction industry Engineering and Technology,Engineering,Engineering Civil Last planner system |
University | Gandhi Institute of Technology and Management (GITAM) |
Universities
Title
Department
Country